AE inspection and adjustment
When MAin PCB is replaced.
Writing in Initial values.
Inspection and Adjustment for AE CCD POSITION.
Inspection and Adjustment for AE SENSOR .
Inspection and Adjustment for AE ACCURACY.
Inspection and Adjustment for APERTURE CONTROL ACCURACY.
Inspection and Adjustment for BUILT-IN SB LIGHT VOLUME .
Adjustment for Battery Level Check.
All the adjustments will be made sequentially.
Caution:
When the main PCB is replaced, write the initial values, and update the version. Then, write the initial values again.
① AE-CCD positioning inspection/adjustment (
② Inspection and adjustment of AE sensor
Caution: Whenever the shutter unit is disassembled/replaced or the main PCB is replaced, make this adjustment.
When performing "obtain of AE sensor reference value", set the metering mode to "Multi-pattern".
Device
SHUTTER TESTER EF-1 (CE)
Inspection and Adjustment for AE ACCURACY
For device and details, refer to
《USB communication》
J19123
- A87 ・ D90 -
When MAin PCB is not replaced.
Select adjustment items individually.
Page
A69.)
《USB communication》
LENS AF50/1.4D
INC
VBA23001-R.3762.A