Installation Of The Battery Modules; Device Connections; Safety And Warning Notes; View Of Battery Modules - Transas NAVI-SAILOR 4100 ECDIS Installation Manual

Table of Contents

Advertisement

Workstations Installation
Installation of the Battery Modules QUINT-BAT/24DC/3.4AH,
QUINT-BAT/24DC/7.2AH, QUINT-BAT/24DC/12AH
QUINT-BAT/24DC are maintenance-free lead gel rechargeable batteries for use with
QUINT-DC-UPS 20A/40A.
Fig. 27. View of Battery modules

Safety and Warning Notes

In order to guarantee safe operation of the device, please read these instructions
thoroughly! The operating instructions for the particular QUINT-DCUPS must also
be observed.
The device may only be installed and put into operation by qualified personnel.
The corresponding national regulations (e.g. VDE, DIN) must be observed.
The VDE 0510 regulations regarding storage, installation and operation of
the rechargeable battery module must be observed.
The site in which the rechargeable battery module is located must have sufficient
ventilation. The rechargeable batteries may only be disposed of when fully
discharged and in acc. with the valid regulations.
The fuse must be removed from the rechargeable battery module when work is
being performed!
When replacing rechargeable batteries, please note that only rechargeable batteries
from the same batch may be used together!

Device Connections

The connection to QUINT-DC-UPS is established using the black (-) and red (+)
connecting cables. The fuse is not inserted until installation has been completed.
1. DC fuse.
2. Connection cable, red = +24 V, black = 0 V.
3. DIN rail adapter QUINT-ADAPTER/4 (only QUINT-BAT/24DC/3,4AH).
Chapter 1. Hardware Installation
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Navi-sailor 4000 ecdis

Table of Contents