Installing The Reservoir; Installing The Tilt Ram - Yamaha 55DEHD Service Manual

Hide thumbs Also See for 55DEHD:
Table of Contents

Advertisement

BRKT
4. Install the new O-ring 4 and PTT motor
5, and then tighten the bolts to the spec-
ified torque.
4
5
NOTE:
Align the armature shaft with the recess in
the joint.
PTT motor mount bolt:
7 N·m (0.7 kgf·m, 5.2 ft·lb)

Installing the reservoir

1. Install the new O-ring 1 and reservoir 2,
and then tighten the bolts 3 to the spec-
ified torque.
3
Reservoir mount bolt 3:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
7-61
Bracket unit
68871235
2
3
1
68871240
2. Fill the PTT fluid into the reservoir, and
then install the new O-ring 4 and reser-
voir cap 5, and then tighten it to the
specified torque.
4
5
NOTE:
Add sufficient fluid of the recommended type
until it overflows out of the filler hole.
Reservoir cap 5:
7 N·m (0.7 kgf·m, 5.2 ft·lb)

Installing the tilt ram

1. Fill the tilt cylinder with the recommended
fluid to the correct level a as shown.
2. Add a small amount of the recommended
fluid through the PTT body hole b as
shown.
a
b
68871250
a
68871270
6885J11

Advertisement

Table of Contents
loading

This manual is also suitable for:

75aet85aed75aehd85aet75aed85aehd

Table of Contents