BRKT
Checking the throttle cable and shift
cable (EHD)
1. Check the throttle cable and shift cable
for smooth operation.
2. Check the inner wire, outer wire of the
throttle cable and shift cable. Replace if
the outer wire is bent or damaged or the
rubber seals are damaged.
Assembling the tiller handle (EHD)
1. Install the throttle shaft 1 into the tiller
handle 2 so that the pin 3 of the throttle
shaft 1 aligned with the mating surface
of the tiller handle 2 in horizontal posi-
tion.
2
A
1
2. Insert the throttle cable 4 into the gear
5 until the inner cable is winded with the
gear.
4
7-3
Bracket unit
3
3
2
61U70470
5
68870025
3. Turn the throttle shaft 1 clockwise to
wind the inner cable until the bolt 6
comes in contact with tiller handle.
6
7
4. Tighten the bolt 6 and lock nut 7.
6
7
NOTE:
Check that the fully closed mark of the indi-
cator is aligned with the mark on the tiller
handle.
Lock nut 7:
11 N·m (1.1 kgf·m, 8.1 ft·lb)
5. Install the bushing 8, spring 9, washer
0, throttle grip q and cover w into the
tiller handle 2.
2
8
0
9
0
q
1
68870010
6887002A
w
68870040
6885J11