Step 6. Positioning the Heater Engine
Place the heater engine in front of the zero clearance box / cavity.
A panel from the cardboard packing carton placed on
the floor underneath the heater engine will help
HINT
prevent possible damage to flooring.
Step 7. Connect Electrical Supply
Plug in 3 pin connector if electrical connections are inside the
fireplace.
Step 8. Prepare Gas Supply
Remove the threaded brass plug from the S/S flexi pipe consumer
gas supply pipe.
Step 9. Insert Heater Engine Into Fireplace
Carefully move the heater engine into the zero clearance box
ensuring the gas supply pipe and fittings
access hole.
Take care that the electrical cord does not bunch up
or get pinched behind the heater engine.
CAUTION
Align the guide rails
heater engine in until the guide plate
rear of the fascia assembly mounting panel
Step 10. Securing The Heater Engine
Secure the guide plate
with two screws
(supplied).
P
Fasten the heater engine to cladding surface using appropriate
fasteners (not supplied) in at least 4 positions as shown
Step 11. Connect Gas, Go to page 37
Rinnai
HEATER ENGINE INSTALLATION
N
with the guide plate
L
is fully home against the
A
O
to fascia assembly mounting panel
A
feed into the rear
and slide the
A
.
O
.
Q
32
L
O
P
Q
A
N
SAPPHIRE RIB2312 OIM