Installation; Installation Of Machine Head - SunStar DPK-5 User Manual

Post bed, 1 needle, lock stitch, zigzag sewing machine
Table of Contents

Advertisement

2

Installation

▶Installation of the machine should be performed by a trained engineer.
▶Any electrical wiring must be performed by a qualified technician or agent.
▶The machine weighs over 53kg. At least 2 persons should carry out the installing work.
▶Plug in after the installation is complete. If the operator mistakenly steps down on the pedal
▶Connect the ground (earth) wire. An unstable connection may result in an electric shock or
▶Place the belt cover on top of the machine.
▶Use both hands when bending the machine backwards or returning it to the normal position.

1) Installation of machine head

Insert the machine head hinge ① into the bed holes. After
aligning it with the rubber hinge ②, stand the machine on the
rubber cushion ③ that is in the direction of the user.
▶Plug in only after oil supply is finished. If the operator mistakenly steps on the pedal with the
▶When handling lubricants, wear protective glasses or gloves to avoid contact with your eyes or
▶Operate the machine only after adding oil when the machine is being used for the first time or
10
with the pug in, the machine will start automatically and can cause physical injuries.
a malfunction.
Using only one hand can lead to severe hand injuries due to the weight of the machine.
plug in, the machine will start automatically and can cause severe injuries.
skin. Inflammation may be caused otherwise. Never drink lubricants since they can cause
vomiting or diarrhea. Keep out of the reach of children.
has been left unused for a long time.
Warning
Caution
[Figure 1]

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dpk-5/sDpk-5/c

Table of Contents