n - cut any excess rack off the end
06.
Slide the gate open and closed by hand to check that the rack is properly aligned with the pinion.
N.B.: make sure that there is a gap of 1–2 mm between the rack and pinion for the entire length of the gate
07.
Strongly tighten the nuts for fixing the gearmotor to the
foundation plate and cover the nuts with the relevant caps
1÷2 mm
08.
Secure the OPEN and CLOSE limit switch bracket: perform the same operations for both limit switches
OPEN:
a - slide the gate leaf open by hand, stopping it 2/3 cm before the mechanical stop
b - slide the limit switch bracket along the rack in the open direction until the limit switch intervenes (a "click" will be heard)
c - after hearing the "click", move the bracket further forward by 2 cm (minimum)
d - secure the bracket to the rack with the grub screws provided
1÷2 mm
2-3 cm
English – 7