B. PV input: Coupling point between the PV modules and the DC-bus.
D. Consumption grid relay: Relays used to isolate the inverter from the grid or the loads. When closed,
these relays connect the inverter to the loads.
E. Grid or auxiliary generator relay: Relays used to disconnect the grid from the ISS 1Play and the loads.
When closed, these relays create a bypass joining grid and loads.
F. Auxiliary grid/genset input: Connection point between the ISS 1Play and the grid.
It is very important to know the configuration of the installation where the ISS 1Play will be connected
to, including the electric power system type. More information about them is included in 2.2.
G. Consumption grid output: Coupling point between the ISS 1Play and the loads.
As in the previous point, it is very important to know the type of the installation that will join the loads
to the ISS 1Play. Further information is shown in 2.2.
Technical Guide
Figure 3: PV input
Figure 4: Grid / Genset input