4 Fit one small rack mounting flange to opposite sides of each power meter.
5 Fit two front linking plates to each power meter.
6 Engage the linking plates at the front of the power meters.
36
(Parts available separately: 5061-9694 and 5063-9212).
Keysight E4416A and E4417A Installation Guide