Maintenance
Maintenance Schedule
Before Each Use
• Check engine oil level
• Perform Safety System Tests
Every 8 Hours or Daily
• Check engine oil level
Every 25 Hours or Annually
• Lubricate control lever linkages
• Lubricate the auger assembly
• Lubricate the discharge chute rotation gear and
deflector
˸ȿ¹·Ê» ʾ» ¾»Î ɾ·¼Ê ·Äº ½»·ÈÉ
Every 50 Hours or Annually
• Check muffler and spark arrester (if equipped)
• Check tire pressure
Engine Maintenance
Please refer to the engine operator's manual for engine main-
tenance schedules and procedures.
Lubricate Control Lever Linkage
Lubricate the control lever linkage at the locations shown in
Figure 6.
6
Lubricate Discharge Chute, Deflector,
and Wheel Axle
˸ȿ¹·Ê» ʾ» º¿É¹¾·È½» ¹¾ËÊ» º»¼Â»¹ÊÅÈ ·Äº ;»»Â ·Î» ·Ê
the locations shown in Figure 7.
7
Lubricate Auger Assembly
Lubricate the auger assembly at the location shown in
Figure 8.
8
en
13
English