Power Supply Connections; Ac Power Supply - ABB WaterMaster FET100 User Manual

Electromagnetic flowmeter transmitter
Table of Contents

Advertisement

WaterMaster FET100
Electromagnetic floweter | Transmitter

3.6 Power Supply Connections

Warning.
Electrical installation and earthing (grounding) must be in accordance with relevant national and
local standards.
Power must be connected via a suitable isolator and fused in accordance with relevant standards.
When changing fuses F1 or F2, isolate the power supply and wait 20 seconds before opening the
enclosure.
Replace fuses with the correct part – see Fig 3.11 (AC power) and 3.12, page 17 (DC power).

3.6.1 AC Power Supply

Power Supply Indicator LED
*AC Fuse F1 250 mA Type T
(see table below for suppliers)
Brown
Green / Yellow
*Fuse Supplier
ABB
Bussmann
Wickmann
Fig. 3.11 AC Power Supply Connections
16
Blue
AC power via a
suitable isolator
and fuse
Fuse Part Number
B20411
BK/ETF 250 mA
19372 K250mA
External Earth Screw
2
>4 mm
(<10 AWG) Copper Wire
Transmitter Label
3 Electrical Installation
Internal Earth
Screws**
**Can be used as a
Protective Earth (PE)
if required by
national standards
OI/FET100–EN Rev. A

Advertisement

Table of Contents
loading

Table of Contents