YASKAWA A1000 Quick Start Manual page 12

Ip23/54 floor standing panel, 400 v class: 90 to 315 kw
Hide thumbs Also See for A1000:
Table of Contents

Advertisement

2 Mechanical Installation
Forklift Lifting Instructions
1. Remove screws on both sides of the unit and remove the side panels. The screws will be needed in step 4.
2. Remove M10 bolts on both sides of the unit and remove all washers.
3. Remove screws on both sides of the unit and remove the front and rear panel.
4. Attach both side panels back to the unit with the screws.
5. Place forks carefully under the unit and lift slowly off the pallet.
6. Attach the front and the rear panel. Torque the screws to 1.3 Nm.
EN 12
YASKAWA Europe TOEP C710616 88A - AC Drive A1000 IP23/54 Floor Standing - Quick Start Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

A14

Table of Contents