Connecting The Protected Equipment - MGE UPS Systems Pulsar Evolution 1500 Installation And User Manual

Pulsar evolution series
Hide thumbs Also See for Pulsar Evolution 1500:
Table of Contents

Advertisement

2.3 Connecting the protected equipment

A Pulsar Evolution 1500 tower UPS has been used below to illustrate the instructions. The principle is the same for all the
other tower and rack models.
Check that the indications on the rating plate on the back of the UPS correspond to your AC-power system and to
the actual electrical consumption of all the equipment to be connected to the UPS.
2
1
As soon as the UPS is energised, the battery begins charging. Eight hours are required to charge to the full rated
backup time.
2. Installation
1 - Remove the power cord supplying the
equipment to be protected.
8
2 - Connect the power cord
from the equipment to the AC-power socket
8 , and then to the AC-power wall outlet.
3 - Connect the protected equipment to the
UPS using the two cords 20 .
Connect priority loads to the two standard
outlets 5 and any non-priority loads to the
two programmable outlets
If the UPS is connected to a
computer running MGE
communications software, it is
possible to program the
interruption of power to the
programmable outlets 6 during
operation on battery power, thus
6
reserving backup power for the
priority loads.
5
4 - Lock the connections using the securing
20
system 26 (for rack models only).
(1) Make sure the cord has the following
characteristics: 250 V, 10 A, cross-sectional area
2
1 mm
, type HO5.
(1)
just removed
6 (1 and 2).
- Page 15
34007117EN/AB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents