www.ti.com
1
Overview
The INA210-215 devices are voltage output, high-side measurement, bi-directional, zero-drift current shunt
monitors. This family of devices has gains that range from 50 V/V to 1000 V/V. The voltage developed
across the device inputs is amplified by the corresponding gain of the specific device and is presented at
the output pin. These devices can sense voltage drops across shunts at common-mode voltages from
–0.3 V to 26 V, independent of supply voltages. These devices operate with supply voltages between 2.7
V and 26 V and draw a maximum of 100 μA. The low offset of the zero-drift architecture enables current
sensing with maximum drops across the shunt as low as 10-mV full-scale.
The INA210-215 devices are currently available in an SC70 surface-mount package.
the available device options.
1.1
INA210-215 Kit Contents
Table 2
summarizes the contents of the INA210-215EVM kit. Contact the
Information Center
the
INA210 device product folder
this product.
1.2
Related Documentation From Texas Instruments
This document provides information regarding Texas Instruments' integrated circuits used in the assembly
of the INA210-215EVM. This user's guide is available from the TI web site under literature number
SBOU164. Any letter appended to the literature number corresponds to the document revision that is
current at the time of the writing of this document. Newer revisions are available from www.ti.com, or call
the Texas Instruments' Literature Response Center at (800) 477-8924 or the Product Information Center
at (972) 644-5580. When ordering, identify the document by both title and literature number.
2
INA210-215EVM Hardware
The INA210-215EVM is intended to provide basic functional evaluation of the INA210-215 device family.
The fixture layout is not intended to be a model for the target circuit, nor is it laid out for electromagnetic
compatibility (EMC) testing. The INA210-215EVM consists of one PCB with an option to cut out six
individual PCBs, one for each of the six devices (INA210, INA211, INA212, INA213, INA214, and INA215).
Each of the PCB cutouts consists of the INA21x device (where x is 0, 1, 2, 3, 4, and 5) and test points for
external hardware connections.
SBOU164 – July 2016
Submit Documentation Feedback
Table 1. INA210-215 Device Summary
Product
INA210
INA211
INA212
INA213
INA214
INA215
nearest you if any component is missing. It is highly recommended that you also check
on the TI web site at www.ti.com for any further information regarding
Table 2. INA210-215EVM Kit Contents
Item
INA210-215 test board
Table 3. Related Documentation
Document
INA21x
product data sheet
Copyright © 2016, Texas Instruments Incorporated
Gain
200
500
1000
50
100
75
Texas Instruments Product
Quantity
1
Literature Number
SBOS437
INA210-215EVM User's Guide
Overview
Table 1
summarizes
3
Need help?
Do you have a question about the INA210-215EVM and is the answer not in the manual?