Air Conditioner Operation - Hitachi ZX27U-2 Operator's Manual

Hydraulic excavator zaxis series
Table of Contents

Advertisement

AIR CONDITIONER OPERATION

1- Control Panel
2- Right Front Air Vent 1
3- Right Front Air Vent 2
4- Foot Air Vent
NOTE: Control air-flow from right front air vents (1 and
2) by rotating the louver in the horizontal direc-
tion so that the air vents can be used as a de-
froster.
5- Air Conditioner Power Switch
Press air conditioner power switch (5) to turn the
power ON.
Controller Part Names and Functions
6- Air Conditioner Switch
Press air conditioner switch (6) to turn the air condi-
tioner and indicator (11) ON.
7- Mode Switch
The air vent location is selected. Each time mode
switch (7) is pressed, the mode indicator (10)
changes in the order shown below.
Air will blow out from right front vents 1(2)
and 2 (3)
Air will blow out from right front vents 1(2)
and 2(3), and the foot vent (4).
Air will blow out from the foot vent (4).
8- Temperature Control Switch
The set temperature decreases each time the switch
with
mark is pressed, and increases each time
the switch with
9- Blower Switch
The blower speed can be adjusted in 3 stages from
Slow, Medium, and Fast.
OPERATOR'S STATION
mark is pressed.
2
3
4
10
7
1-12
1
11
6
8
9
5
M1M7-01-004
M1M7-01-009
M1M7-01-039

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zx30u-2Zx35u-2Zx40u-2Zx50u-2

Table of Contents