LIFTING MACHINE WITH CRANE

WARNING:
Do not lift the machine with anyone riding on
the machine.
Use wire ropes and shackles strong enough to
support the weight of the machine.
Be sure to set the blade position with the en-
gine running. Failure to do so may cause the
blade to be moved from the set-position when
lifted with a crane.
1. Swing the upperstructure so the blade is positioned at
the rear of the counterweight.
2. Fully retract the blade cylinder.
3. Fully extend the boom, arm and bucket cylinders, as
illustrated to the right. Pull the pilot control shut-off
lever to LOCK position.
4. Position the boom straight ahead of the upperstruc-
ture. Apply the boom swing pedal lock.
5. Attach shackles to the boom and blade hooks. Se-
curely thread wire ropes through the shackles.
6. Slowly lift the machine so that shock loads will not be
applied to the machine. Take sufficient care not to
lose the balance of the machine.
TRANSPORTING
ZX27U
ZX30U
ZX35U
ZX40U
ZX50U
6-5
: 2400 mm (94 in)
-2
: 2000 mm (79 in)
-2
: 2000 mm (79 in)
-2
: 1900 mm (75 in)
-2
: 1700 mm (67 in)
-2
ZX27U
: 4450 mm (175 in)
-2
ZX30U
: 4200 mm (165 in)
-2
ZX35U
: 4200 mm (165 in)
-2
ZX40U
: 4200 mm (165 in)
-2
ZX50U
: 4150 mm (163 in)
-2
M1M7-06-002