5.1.4
Starting characteristics
When commissioning, an increased current drain can be expected due to the lubricating
behavior (inadequate distribution of grease or oil) and due to the running-in behavior of the
shaft sealing rings.
1FT6 Synchronous Motors
Configuration Manual, (PFT6), 10.2005 Edition, 6SN1197-0AD02-0BP1
Selecting/dimension gearboxes and important quantities
Planetary Gearbox
5-3