Pre-Start Inspection - JLG 600SC Operation And Safety Manual

S/n 74785 to present
Table of Contents

Advertisement

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

Pre-Start Inspection

The Pre-Start Inspection should include each of the follow-
ing:
1. Cleanliness – Check all surfaces for leakage (oil, fuel,
or battery fluid) or foreign objects. Report any leakage to
the proper maintenance personnel.
2. Structure - Inspect the machine structure for dents,
damage, weld or parent metal cracks or other discrep-
ancies.
Parent Metal Crack
3. Decals and Placards – Check all for cleanliness and
legibility. Make sure none of the decals and placards are
missing. Make sure all illegible decals and placards are
cleaned or replaced.
4. Operators and Safety Manuals – Make sure a copy of
the Operator and Safety Manual, AEM Safety Manual
(Domestic only), and ANSI Manual of Responsibilities
2-4
Weld Crack
– JLG Lift –
(Domestic only) is enclosed in the weather resistant
storage container.
5. "Walk-Around" Inspection – Refer to Figure 2-4., Fig-
ure 2-6. and Figure 2-7.
6. Battery – Charge as required.
7. Fuel (Combustion Engine Powered Machines) – Add the
proper fuel as necessary.
8. Engine Oil Supply - Ensure the engine oil level is at the
Full mark on the dipstick and the filler cap is secure.
9. Hydraulic Oil – Check the hydraulic oil level. Ensure
hydraulic oil is added as required.
10. Accessories/Attachments - Reference the Operator
and Safety Manual of each attachment or accessory
installed upon the machine for specific inspection, oper-
ation, and maintenance instructions.
11. Function Check – Once the "Walk-Around" Inspection
is complete, perform a functional check of all systems in
an area free of overhead and ground level obstructions.
Refer to Section 4 for more specific operating instruc-
tions.
3121156

Advertisement

Table of Contents
loading

This manual is also suitable for:

660sjc

Table of Contents