Daily Walkaround Inspection Points - JLG 600SC Operation And Safety Manual

S/n 74785 to present
Table of Contents

Advertisement

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
General
Begin the "Walk-Around Inspection" at Item 1, as noted on
the diagram. Continue to the right (counterclockwise
viewed from top) checking each item in sequence for the
conditions listed in the following checklist.
TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS OFF.
DO NOT OPERATE MACHINE UNTIL ALL MALFUNCTIONS HAVE BEEN
CORRECTED.
INSPECTION NOTE: On all components, make sure there
are no loose or missing parts, that they are securely fas-
tened, and no visible damage, leaks or excessive wear
exists in addition to any other criteria mentioned.
1. Platform Assembly and Gate - Footswitch works
properly, not modified, disabled or blocked. Latch,
stop, and hinges in working condition.
2. Platform Control Console - Switches and levers
return to neutral, decals/placards secure and legible,
control markings legible.
2-12
Figure 2-5. Daily Walkaround Inspection Points - Sheet 1 of 3
3. Rotator - See Inspection Note.
4. Rotator Motion Control Valve - See Inspection Note.
5. Articulating Jib Boom - See Inspection Note.
6. Dual Capacity Limit Switch, Transport Position
Limit Switch - Switches operate properly.
7. Power Track - See Inspection Note.
8. Turntable Bearing and Pinion - No evidence of loose
bolts or looseness between bearing and structure. See
Inspection Note.
9. Right Track - Properly secured plates, no loose or
missing track bolts, no dislocation of the track pins.
Proper tension. See Inspection Note.
10. Final Drive, Both Sides - See Inspection Note.
11. Turntable Lock - Operable; See Inspection Note.
12. Auxiliary Power Pump - See Inspection Note.
13. Bottom Rollers, Right Side - See Inspection Note.
14. Track Carrier Roller, Both Sides - See Inspection
Note.
– JLG Lift –
3121156