Mount The Cdd - ABB CDD Product Manual

Concentrator data device
Table of Contents

Advertisement

M
ount the CDD
It is recommended to undertake all the configuration operations in part 4 before
mounting the CDD in a permanent location. During acquisition of the inverters in part
5, it can be determined if reception from the inverters and router is sufficient, or if the
final position or location of the CDD should be changed.
Make the two holes necessary, using a drill with a 5 mm diameter bit.
The depth of the holes must be around 30 mm.
Insert plugs in the holes and tighten the countersunk screws supplied.
Fasten the CDD by putting the head of the screws in the two holes on the back.
- 14 -
2 - Plan the installation

Advertisement

Table of Contents
loading

Table of Contents