6 Electrical Installation
Wiring Preparation
1.
Refer to
Cable Gland Selection on page 36
the drive.
2.
Prepare all cables with terminal ends to ensure proper connections.
3.
Remove the rubber bushing covering the conduit openings at the bottom of the
drive. Review
the proper conduit openings.
NOTICE: The rubber bushing used in the drive enclosure does not guarantee protection from water and
dust. The rubber bushings can be removed without the use of a tool. For more permanent installations,
replace rubber bushings with UL approved cable glands or gland cover plates with NEMA Type 4X, or IP66
integrity.
Figure 8
Power supply cable
30
YASKAWA ELECTRIC TOBP C710606 35D YASKAWA AC Drive - V1000 NEMA Type 4X/IP66 Installation Manual
Figure 8
to route the main circuit and control circuit cables through
Control circuit cable
Main circuit option cables
for connection of main circuit options
Figure 8 Conduit Openings
to select the proper cable glands for
Motor cable