Download Print this page

Installation - Effecta Komplett III 25kW Quick Start Manual

Comissioning guide

Advertisement

Calibration of feed dose - Suction version
Filling the internal storage
Press anywhere on the display and then press the OPE-
RATION icon.
Operation settings menu:
Use the + and - buttons together with OK and the Return
key to navigate the menu system.
- Confirm that burner is set to OFF.
Installation menu:
Enter the INSTALLATION menu.
Scroll down to SUCTION SYSTEM and press OK.
Suction system menu:
In the suction system menu scroll down to FILL STORA-
GE and set the function to ON.
The filling process will now begin.
NOTE: There is a delay time until the vacuum motor co-
mes. It will take 2-3 minutes until the turbine comes on
and with a empty storage it can take up to 15 minutes
until it is fully filled.
If the feeder isn´t running it is likely that under pressure over the boiler isn´t sufficient.
Make sure that the burner fall shaft is plugged at all time when the black plastic fall
hose is out of the burner.
Effecta AB - Västra Rågdalsvägen 21 - 434 99 Kungsbacka - 0300 - 22320 - info@effecta.se
Operation settings
Burner
Fan
Feeder settings
Temperature set
Information
Service

Installation

Installation
Advanced
Fill feeder
Effect High speed
Effect low sepped
Testblow start
Phase out
Fan Pre oper.
Fan low pre oper.
Clean Phase out
Flame Sens
Quick Start
Lam,bda probe
Suction System
Cascade
Suction system
Filling interval
Night blockage
Clean int. storage
Fill Storage
Off
>
NO
15kW
0kW
0s
10s
40%
50%
12s
>
>
>
>
>
0 (4)h
On
1 (25)h
Off
13

Advertisement

loading

This manual is also suitable for:

Komplett iii 35kwKomplett iii 20kw