13.3 REGULAR MAINTENANCE INSPECTION PLAN
All maintenance and servicing must be carried out by technicians authorized by
VALMAR Company.
Maintenance inspection
Electricity connections check
Tightness of the screws and bolts
Monitoring the beater blades
Replacing the beater blades
Lubrication of bearings
Cooling gas check
13.4 TEST RUN
Procedure of the test run:
make sure that the mixture treating control panel is in STOP state;
make sure that the ejection hole cover is well closed;
open the cylinder cover and pour approximately 4 inches (10 cm) of
water into the cylinder;
close the cylinder cover;
press the MIXING/EXTRACTION key;
Let the machine operate for 10 seconds at the most! The appliance is
allowed to run without ice cream mixture for 10 seconds at the
most.
press the STOP / RESET key;
place a suitable container under the ejection opening, open the opening
and empty the water out of the cylinder
13.5 CHECKING THE CONDITION AND WEAR OF THE BEATER
BLADES AND SLIDERS
BEATER SLIDER
DAILY
WEEKLY
X
68
EVERY
ANNUALLY
THREE
MONTHS
X
X
X
X
X
BEATER BLADE