Adjust The Location Of The Cable Management Arm; Connect And Route The Cables - IBM Storwize V7000 Quick Installation Manual

Table of Contents

Advertisement

Figure 27. Adjust the location of the cable management arm.
6. Attach the power cords and other cables to the rear of the file module
(including keyboard, monitor, and mouse cables, if required).
Route the cables and power cords on the cable management arm 1 and
secure them with cable ties or hook-and-loop fasteners.
Note: Allow slack in all cables to avoid tension in the cables as the cable
management arm moves.
Figure 28. Connect and route the cables.
7. Insert the M6 screws to the rear of the slides. Use a cable tie to secure the free
end of the cable management arm to the rack, if needed.
1
Chapter 2. Performing the hardware installation
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storwize v7000 unified

Table of Contents