Hole Locations In The Front Of The Rack - IBM Storwize V7000 Quick Installation Manual

Table of Contents

Advertisement

2 Units
Figure 12. Hole locations in the front of the rack
1 Bottom rail location pin hole
v
2 Enclosure mounting screw hole. Do not insert the screw until the
v
enclosure is installed.
3 Rack mounting screw hole
v
4 Top rail location pin hole
v
3. Align the bottom of the rail with the bottom of the two rack units. Insert the
rail location pins 1 and 4 through the holes in the rack cabinet.
4. Insert a clamping screw into the rack mounting hole 3 between the rail
location pins.
5. Tighten the screw to secure the rail to the rack.
6. Working from the rear of the rack cabinet, extend the rail that you secured to
the front to align the bottom of the rail with the bottom of the two rack units.
Note: Ensure that the rail is level between the front and the back.
Figure 13 on page 16 shows two rack units with the back mounting holes
identified.
4
3
2
1
Chapter 2. Performing the hardware installation
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storwize v7000 unified

Table of Contents