Step 13. Connecting The Power Cords; Diagram Showing How To Connect The File - IBM Storwize V7000 Quick Installation Manual

Table of Contents

Advertisement

|
|
|

Step 13. Connecting the power cords

1
2
3
4
5
CAUTIO N
Disconnect all
supply power for
complete isolation
Figure 38. Diagram showing how to connect the file modules to the control enclosure using
Fibre Channel cables. Refer to previous table.
Note: If you are using the Storwize V7000 Unified for remote copy or block I/O,
connect the Fibre cables to the remaining controller canisters Fibre channel ports 3
and 4.
Control enclosure:
Two power supply units are located in each enclosure. Ensure that the power
switches for the control enclosure and expansion enclosures power supply unit are
switched off.
Note: Each power supply unit comes with an attached cable retention bracket that
fastens around the power cord to prevent the cord from being removed
accidentally.
Perform the following steps when you attach the power cord to each power supply
unit:
A
3
PCI
4
3
PCI
4
6
7
Chapter 2. Performing the hardware installation
B
C
CAUT I O N
Disconnect all
supply power for
complete isolation
8
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storwize v7000 unified

Table of Contents