Preparing for Operation

On units Without Electrically Operated Valves, Skip Steps 1 and 2 Below
1. Plug transformer into electrical outlet. The 24V supply must be connected in the dispensing tower.
2. Turn the key-switch to the ON position. The ice-bin lid must be closed to allow the valves to operate.
3. Adjust the CO
regulators as indicated in the following chart:
2
Primary (Carbonator) feed line to Carb secondary regulator
Secondary, Sugared Syrup Tank
Secondary, Diet Syrup Tank
Secondary, B-I-B
4. Operate each valve until product is flowing.
5. Fill the bin with 32F ice. DO NOT use ice taken directly from the freezer.
6. Adjust the brix (water-to-syrup ratio) for post-mix valves.
© 2003-2017, Cornelius Inc.
Post-Mix
Regulator
- 19 -
IntelliCarb Drop-In Ice Cooled Installation Guide
Pressure Setting
90-120 PSI
55 PSI min.
8-12 PSI
60 PSI min
Publication Number: 630460204INS