3.2 Wall-mount Plate Mounting
To install the Industrial PoE+ Switch on the wall, please follow the instructions
described below.
Step 1: To remove the DIN-Rail from the Industrial PoE+ Switch, loosen the
screws to remove the DIN-rail.
Step 2: Place the wall mount plate on the rear panel of the Industrial PoE+
Switch.
Step 3: Use the screws to screw the wall mount plate on the Industrial PoE+
Switch.
Step 4: Use the hook holes at the corners of the wall mount plate to hang the
Industrial PoE+ Switch on the wall.
Step 5: To remove the wall mount plate, reverse the steps above.
16