Installation; Din-Rail Mounting Installation - Planet IFGS-1022HPT User Manual

Industrial 8-port 10/100tx 802.3at poe+ 2-port gigabit tp/sfp combo ethernet switch
Hide thumbs Also See for IFGS-1022HPT:
Table of Contents

Advertisement

3. Installation

This
section
describes
components and guides how to install it on the DIN-rail and wall. Basic knowledge
of networking is assumed. Please read this chapter completely before continuing.
This following picture is telling the user how to install the device,
and the device is not IFGS-1022HPT.
Note

3.1 DIN-rail Mounting Installation

The DIN-rail is screwed on the Industrial PoE+ Switch when out of factory. When
replacing the wall-mount application with DIN-rail application, Industrial PoE+
Switch is needed. Please refer to the following figures to screw the DIN-rail on the
Industrial PoE+ Switch. To hang the Industrial PoE+ Switch, follow the following
steps:
Step 1: Screw the DIN-rail on the Industrial PoE+ Switch.
14
the
functionalities
of
the
Industrial
PoE+
Switch's

Advertisement

Table of Contents
loading

Table of Contents