Spectralink IP-DECT Server 400/6500 and DECT Server 2500/8000 Synchronization and Deployment Guide
Deployment Procedure
Start by placing your tripod with the Spectralink IP-DECT Server 400 (from your deployment tools)
where you plan the first base station (the sync master) to be:
Take picture of the placement and note it on a blueprint of the building.
Remember to consider that the first base station (sync master) shall be placed centrally in the
l
installation so the rest of the system can spread from it (remember to consider all 3 dimen-
sions.
Note:
Take picture of the placement and note it on a blueprint of the building.
Make a call between the two handsets. During the deployment there must always be an active
l
call established.
Note:
Measurements are only valid on handsets in a connected call!
Play music/talk into the handset without headset. Wear the headset and listen to the sound
l
quality all the time.
At the same time as listening to the sound quality, use your handset to measure how far the
l
base station will cover sufficiently.
This is done by walking away from the base station with the handset and measure where the
RSSI value drops below 75 and the Q value stays constant at 64. Do this in all dir-
ections from the base.
For a description of the parameters and RPN values, see
Note:
The handset can only measure correctly when off hook.
When measuring, carry the handset with your hands covering the antennas to
assimilate normal user conditions (heads or surroundings blocking the radio sig-
nals when holding the handset to the ear).
To perform a site survey using a Spectralink Standard Handset (7522/7532,7622/7642,
l
7722/7742), enter Survey mode on the handset. For more information about using the
14169000-IG, Edition 11.0
January 2018, Original document
"Important Parameters" on page
17.