On-Site Deployment; Deployment Tools - SpectraLink IP-DECT Server 400 Synchronization And Deployment Manual

Hide thumbs Also See for IP-DECT Server 400:
Table of Contents

Advertisement

Spectralink IP-DECT Server 400/6500 and DECT Server 2500/8000 Synchronization and Deployment Guide

On-site Deployment

Deployment Tools

Bring the following tools on a site for deployment:
1 Spectralink IP-DECT Server 400
l
1 Battery pack min. 8V/max. 60V
l
1 Tripod (app 2m high)
l
1 Cable with RJ45 plug (pin 1 must be connected to pin 3, pin 2 must be connected to pin 6)
l
Note:
Preferably the tripod shall place the Spectralink IP-DECT Server 400 at the height
where you will place the server/base stations/repeaters in the final installation.
If 2 people perform the deployment at IP-DECT sites, you shall also bring:
Minimum 1 Spectralink DECT repeater (the repeater must be set up to synchronize on the
l
Spectralink IP-DECT Server 400 used for the deployment).
9V Battery pack
l
1 Tripod (app 2m high)
l
1 Cable to connect battery pack and Spectralink DECT repeater (with RJ11 plug in for the
l
repeater) For a description of pin connections, see the information on the Power Supply.
14169000-IG, Edition 11.0
January 2018, Original document
15

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IP-DECT Server 400 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Ip-dect server 6500Dect server 8000Dect server 2500

Table of Contents