Installation

Initial product inspection

Perform the following product inspection procedure when you receive your instrument:
1.
Inspect the shipping carton for external damage, which may indicate damage to the instrument.
2.
Remove the SPG8000A generator from the shipping carton, and then check that the instrument has not been damaged in
transit. Prior to shipment the instrument is thoroughly inspected for mechanical defects. The exterior should not have any
scratches or impact marks.
NOTE. Save the shipping carton and packaging materials for instrument repackaging in case shipment becomes necessary.
3.
Verify that the shipping carton contains the instrument, the standard accessories, and any optional accessories that you
ordered. See
Table 4: Standard and optional accessories
4.
Verify that all of the product options that you ordered are installed:
Before installation, you can verify the hardware options by viewing the rear panel. See
on page 20. After installation, use the SYSTEM : OPTIONS menu selection to view which product options are
installed.
If you ordered Option PTP when you purchased the instrument, this software option should already be enabled and you
should have received a document showing the option key. After the instrument is installed, use the
SYSTEM : OPTIONS menu selection to verify that the option is enabled. If you need to enter the option key, see
to enter the option key (Option PTP only)
The following example display shows all of the available hardware options (GPS, AG, BG, SDI) and software options
(3G, DBT, PTP) that may be installed. Software options 3G (3G-SDI signals) and DBT (Dolby E audio generation) are
included with Option SDI.
Contact your local Tektronix Field Office or representative if there is a problem with your instrument or if your shipment is
incomplete.

Exterior cleaning

The instrument exterior was inspected for debris when it was shipped. If necessary, you can clean the exterior of the instrument
as follows.
WARNING. To prevent injury or death, power off the instrument and disconnect it from line voltage before cleaning.
SPG8000A Installation and Safety Instructions
on page 5.
on page 4.
Figure 4: SPG8000A rear panel
How
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spg8000abg

Table of Contents