Pressure Requirements from your house supply.
We recommend a bar pressure between 2 and 3 bar. If you have a
combi boiler system no problem should be experienced. If you
have a gravity feed older type of installation (hot water tank type
usually less than 1 bar) you will almost certainly need a pump. We
cannot advise on which type of pump is used, location or design
because all house plumbing layouts vary. This is a job for your in-
staller /plumber. The end delivery however must fall within the
scope above.
Debit Requirements.
You will need the debit capabilities of at least 10 litres per minute.
Again an average combi boiler will supply this but please check if
you have a gravity feed system.
Important Note Do not exceed 3 bar pressure under any circum-
stances. Warranty void if so as damage will occur. If combi. type
supply, use a pressure reducing valve if required.
Remembering this product is free standing and designed to be
pulled away from the wall, the water supply pipes and waste pipe
require flexible pipes. If you purchased the fitted kit with this
shower you will have the required fittings. The water supply pipes
need to be at least 1 metre long and flexi braided type not speed
fit type heating piping. Your generator will have 3 x connections.
Water in, waste water to house waste and the insulated white pipe
which is steam out going to the tub. Make sure these are fitted in
correct position as they are only attached for transit delivery rea-
sons! Please note if a shower pump is used via gravity system we
recommend a separate cold feed bypassing pump direct to genera-
tor to avoid damage to the generator. Further to this as you would
For the latest fitting instructions please visit www.insigniarange.co.uk
31
with a washing machine or dishwasher, it is highly recommended
accessible water valve taps are installed to turn off the shower
when not In use. This will avoid any possible flooding due to a
burst pipe or connection failure in the future.
Electrical House connections.
WE REITERATE: NEVER ATTEMPT THIS YOURSELF. THIS MUST BE
UNDERTAKEN BY A QUALIFIED ELECTRICAL COMPANY. A CERTIFI-
CATE MUST BE OBTAINED AFTER INSTALLATION AS PROVE OF
COMPLIANCE WITH CURRENT SAFETY REGULATIONS AND WILL BE
REQUIRED TO CONFORM WITH ANY WARRANTY OFFERED WITH
THIS PRODUCT.
UNDER NO CIRCUMSTANCES UNDERTAKE THIS YOURSELF!!!
Note for electrician. This product comes with 13 amp plug(s) fitted
with RCD unit. We leave the way you prefer to connect this to
yourself due to continued additions to current regulations. As at
October 2010 we offered two following alternatives.
1) Connect within current IP directives using plug RCD provided
2) (Preferred) Wire into isolated fused feed connecting directly to
the house consumer / service box. Remove the plug / RCD fitted
and ensure the Consumer unit has capabilities to replace RCD fea-
ture.
Please note earth is required and found on chassis of bath tub. A
further earth is required from Steam Generator unit. Each earth
must ground through power supply line.