MOUNTING OF THE BURN CHAMBER ON THE PORTAL BASEL
The stove is delivered with the screws mounted.
These must be removed before mounting the base.
A ( 1 : 5 )
portal mont
EMNE:
AREAL:
1
NAVN:
MATERIALE:
DIMENSION:
STI:
N/A
VÆGT:
DATO:
N/A
Krog Iversen & Co A/S
DK-5492 Vissenbjerg©
When the stove has been placed on the base,
the four screws must be remounted.
Scan 68
Portal sokkel mont.
EMNE:
C:\Working Folder\Designs\Scan 68\10068900 - Manual.iam
90068017
TG.NR:
hms
10-04-2015
SIGN:
N/A
DATO:
18-03-2015
VÆGT:
N/A
AREAL:
Scan A/S
DK-5492 Vissenbjerg©
2
90068010
TG.NR:
sr
SIGN:
15