5.1 Checking Before Power-On

5.2 Powering On the System
5.1 Checking Before Power-On
Table 5-1 lists the items to be checked before the SmartLogger is powered on.
Table 5-1 Items to be checked for the SmartLogger before power-on
No.
1
2
3
4
5
6
7
8
(2016-06-20)
Check Item
The SmartLogger and RS485 signal SPDs are installed
correctly and securely.
Ground cables of the SmartLogger and RS485 signal
SPDs are connected to ground points securely.
The cables between the SmartLogger and the RS485
signal SPDs are securely connected.
The RS485 communications cable is securely and reliably
connected.
The AC power cable is securely connected to the
SmartLogger when the PLC communication is used.
Ports not used (such as the RF1, RF2, optical port, and
Ethernet port) are protected by dustproof plugs.
Routing for the power cable and signal cable meets the
requirements for routing strong-current and weak-current
cables and complies with the cable routing plan.
Cables are bound neatly, and cable ties are secured evenly
and properly in the same direction.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5

System Operation

5 System Operation
Check Result
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
69