Mgc+50 Hardware Installation; Unpacking And Positioning The Mgc+50 - Polycom DOC2231A Getting Started Manual

Polycom video conference bridge getting started guide
Table of Contents

Advertisement

MGC+50 Hardware Installation

Unpacking and Positioning the MGC+50

To unpack and position the MGC+50:
1.
When you receive your MGC+50, inspect the equipment for damage and
verify that the components match the packing slip. If you did not receive
a component or if there is damage to the system, notify Polycom
immediately.
Wood Packing Case
Lock in Closed Position
Lock in Open Position
Figure 2-3: MGC+50 package
2.
Place the MGC+50 unit on a stable flat surface in a location that meets
the MGC+50's environment requirements, which are:
— Operating temperature: 10°–40°C (50°–104°F)
— Humidity: 15%–90% noncondensing
— Altitude: Up to 3,000m (10,000ft)
— ESD: +8 kV
MGC+50/MGC+100 Getting Started Guide
Carrying Strap
2-7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DOC2231A and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Mgc+50Mgc+100

Table of Contents