6.6 Procedure

Figure 13
A-240Z-A CPE connections
ON/OFF
button
Issue: 01
 
Use this procedure to install an A-240Z-A CPE.
1
Place the CPE unit on a flat surface, such as a desk or shelf.
Note —
other equipment. The CPE mounting requirements are:
allow a minimum 100 mm clearance above the top cover
allow a minimum 50 mm clearance from the side vents
do not place any heat source directly above the top cover or below the
bottom cover
2
Review the connection locations as shown in Figures 13.
ON/OFF
TEL1
TEL2
WAN
TEL1 and TEL2
WAN port
POTS ports
(RJ-45)
(RJ-11)
3
Connect the Ethernet cables to the RJ-45 ports; see Figure
ports.
4
Connect the WAN cable to the RJ-45 WAN port; see Figure
WAN port.
5
Route the POTS cables directly to the RJ-11 ports as per local practices.
The POTS port to the left is labeled TEL1 for Line 1 while the port on the right is labeled TEL2
for Line 2, as shown in Figure 13.
6
Connect the power cable to the power connector.
The A-240Z-A cannot be stacked with another CPE or with
LAN1
LAN2
LAN3
LAN4
LAN ports (4)
(RJ-45)
3FE-46615-AAAA-TCZZA
Install an A-240Z-A CPE
USB
USB
UPS
LED
USB 2.0
LED on/off
Power supply
ports (2)
connector
13
for the location of the RJ-45
13
for the location of the RJ-45
POWER
Power
connector
Reset
button
button