15 Troubleshooting
Event number
Message, cause and corrective measures
9332
Battery fault
External battery management has been detected but not configured.
Corrective measures:
9333
Battery fault
Measured battery voltage in the Sunny Island at L1 / L2 / L3 is below the permissible mea-
surement range. The usable battery capacity may be too small, e.g., due to aging.
Corrective measures:
9341
Status change to battery equalization charge
9362
Battery fault
The deep discharge protection range BatResSoc or the deep discharge protection range be-
fore disconnection ProResSOC has been reached.
A fuse may have tripped at the grid-connection point.
Corrective measures:
The utility grid may not work within the set system limits.
Corrective measures:
9401
Energy saving mode of slaves in 1-phase parallel op
9402
Energy saving in the network
9403
Energy saving mode start
9404
Energy saving mode stop
9601
Digital input at [xx] has changed its status to [xx]
10001
Parallel grid operation
10003
Operation status
10004
Cold start status
10006
Startup status
10007
Stop status
10010
Restart diagnosis system in device
166
SI44M-80H-12-BE-en-10
• Start the installation assistant and configure a new system with external energy
management (e.g., system with lithium-ion battery).
• Charge the battery.
• Ensure that all battery cells are functional.
• Activate the fuse.
• Replace the fuse if necessary.
• Check whether the grid parameters is still within the set system limits.
• Contact the grid operator if necessary.
SMA Solar Technology AG
Operating Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunny island 8.0hSunny island 6.0h

Table of Contents