KROHNE OPTIWAVE 5200 C Quick Start-Up page 21

2-wire / 10 ghz radar (fmcw) level meter
Table of Contents

Advertisement

OPTIWAVE 5200 C/F
Figure 2-25: Installation of the weather protection (general procedure)
1 Remove the 2 butterfly screws from the housing. Make sure that spring washer is attached
correctly to the housing (on the weather protection fixture).
2 Lower the weather protection onto the device.
3 Attach the 2 butterfly screws. Make sure that you use the correct holes to attach the weather
protection. The holes must agree with the housing option used (compact vertical (non-Ex or
Ex i-approved etc.)). For more data, refer to the illustration that follows:
08/2013 - 4001905202 - QS OPTIWAVE 5200 R02 en
www.krohne.com
INSTALLATION
2
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optiwave 5200 f

Table of Contents