www.samsondoors.co.uk 0800 328 6250 www.samsondoors.co.uk Installation manual Sun awning V225 - Porto semi-cassette Content package 1. Sun awning * 2. Control a. Manual control: crank handle b. Electrical: switch + plug c. Remote controlled: remote control + plug * The displayed awning is a manual control version. Necessary tools •...
www.samsondoors.co.uk 0800 328 6250 www.samsondoors.co.uk Installation manual Sun awning V225 - Porto semi-cassette Specifications Sizes in mm Wall installation Front view wall support, left Awning section Minimal width per fabric projection Projection [mm] Minimal awning width [mm] 1500 1830 2000 2400 2500 2960...
Page 4
General warning Mounting the Verano® product yourself is at your own risk. Only use this instruction as a tool and for the mounting of this specific Verano® product. If you cannot mount the product yourself, you can always opt for professional mounting. The mounting team of Verano®...
www.samsondoors.co.uk 0800 328 6250 www.samsondoors.co.uk Installation manual Sun awning V225 - Porto semi-cassette Installation on the wall 1.1 Marking the holes For the installation of the awning, the two wall supports (A) need to be level horizontal and vertical. See figure 1.1 and 1.2.
Page 6
www.samsondoors.co.uk 0800 328 6250 www.samsondoors.co.uk Installation manual Sun awning V225 - Porto semi-cassette 1.4 Installation using wall strips If there are less than five rows of stones above the installation location, wall strips need to be used. The strips divide the power over a larger wall surface so that the wall can carry more weight.
Page 7
www.samsondoors.co.uk 0800 328 6250 www.samsondoors.co.uk Installation manual Sun awning V225 - Porto semi-cassette Electrical wall control 2.1 Connecting the wall control 1. Check the position of the motor (left or right), seen from the outside! 2. If you have inside control, first guide the cable through the hole in the wall you drilled before. 3.
www.samsondoors.co.uk 0800 328 6250 www.samsondoors.co.uk Installation manual Sun awning V225 - Porto semi-cassette Remote control 3.1 Connecting the remote control 1. If the power point is located on the inside, first guide the wire through the hole in the wall you drilled before. 2.
Page 9
www.samsondoors.co.uk 0800 328 6250 www.samsondoors.co.uk Installation manual Sun awning V225 - Porto semi-cassette Inclination 4.1 Standard factory setting The walk-through height of the front bar is standardly set between 1,80 and 1,90 meter at an installation height of 2,70 meter. 4.2 Setting the inclination If you want to set the awning different from the standard factory setting, follow the steps below: 1.
www.samsondoors.co.uk 0800 328 6250 www.samsondoors.co.uk Installation manual Sun awning V225 - Porto semi-cassette Front bar 5.1 Setting the front bar The right position can be achieved if the front bar connects perfectly to the top- and bottom cap if the awning is closed. See figure 5.1.
Page 11
www.samsondoors.co.uk 0800 328 6250 www.samsondoors.co.uk Installation manual Sun awning V225 - Porto semi-cassette Valance 6.1 Installation of the valance Follow the steps below for the installation of the valance. See figure 6.1. 1. Take the cover of the front bar on one side. The fabric tendon is locked in the front bar. 2.
www.samsondoors.co.uk 0800 328 6250 www.samsondoors.co.uk User information A high quality cloth is integrated into your chosen in your screen that are difficult to detect and impossible screen. In view of optimal quality we have chosen a high to avoid. They are inherent in all technical materials but technology production process in which every step of do not reduce the technical presentation and durability the production is strictly selected.
Need help?
Do you have a question about the V225 Porto and is the answer not in the manual?
Questions and answers