Test Run

<Conducting a Test Run for the Smart Manager>
• A test run is necessary to confirm that the Smart Manager has recognized air conditioner units after the central
control address setting.
(1) Turn on the power of all connected air conditioners.
(2) Turn on the power of the Smart Manager.
(3) Make sure that the number of air conditioners connected to each line (only main units when group control is
performed) equals the group number count displayed on the Smart Manager.
(4) When these numbers are identical, there is no problem.
If they differ, set central control addresses again according to "Central Control Address (Group Number)
Setting." Also make sure that there is no incorrect wiring.
<Conducting a Test Run for Air Conditioners>
(1) Press the
(2) Confirm that pressing the
adjustable during test run.)
(3) When the test run is completed, press the
-EN
22
AMP Air Conditioning
button for at least 4 seconds. (The "TEST" indication lights in the test run mode.)
/
buttons starts/stops air conditioning. (Temperature setting is not
button to exit the test run mode.