Smart Manager
A connection example of system wiring is shown below.
Connection of wiring
Here is shown a connection example of smart manager wiring to indoor units, Energy monitoring relay interface,
Digital Input/Output relay interface and client PC.
Termination setting
• RS-485 termination: Terminate both ends of RS-485 wire; one end on the smart manager and the other on the
interface. The termination on the smart manager has been set at shipping. For the termination on the interface,
refer to the Installation Manual of the interface.
• TCC-LINK termination: Terminate it in indoor units. Do not terminate on the smart manager; leave it open.
Earthing the shield wire
• RS-485 cable's shield wire: Connect it to the FG terminal.
• TCC-LINK cable's shield wire: Do not connect it to the FG terminal. TCC-LINK cable must be earthed on the air
conditioner.
Group/zone/line settings of indoor units
• The settings of indoor units can be configured collectively by groups, zones or lines.
• Groups 1-64 correspond to the central control addresses 1-64 for indoor units, respectively. See "6.Central
Control Address (Group Number) Setting".
• A smart manager has two TCC-LINK communication lines: line 1 and line 2. Each line can contain up to 64
groups and 64 zones, and 128 groups and 128 zones can be set in total.
• A zone is a control unit consisting of a combination of any indoor units. You can make up to 64 zones pairing any
of up to 64 groups. For setting zones, see "8.Zone Setting".
Connecting interface
Connect the Energy monitoring relay interface and Digital Input/Output relay interface to the RS-485
communication cable. See the Installation Manuals of the interface for details.
TCC-LINK2
LINE 2
LINE 1
Group
1 ~ 16
ZONE 17
Group
17 ~ 32
ZONE 33
Group
33 ~ 48
Group
49 ~ 64
ALL: The Smart Manager operates as follows in combination with LINE selection.
LINE 1 ALL (All groups on LINE 1 are selected.)
Gr = Group
LINE 2 ALL (All groups on LINE 2 are selected.)
AMP Air Conditioning
LAN cable
Hub
RS-485
ZONE 1
ZONE 2
Gr1
Gr2
ZONE 19
Gr17
Gr19
Gr22
Gr33
Gr35
Gr39
Gr49
Gr50
Gr55
LAN cable
ALL
ZONE 10
Gr5
Gr8
Gr10
ZONE 22
ZONE 30
Gr25
Gr30
ZONE 39
Gr43
Gr45
Gr58
Gr60
www.ampair.co.uk | sales@ampair.co.uk
Installation Manual
Client PC
Energy
monitoring
relay interface
ZONE 16
Gr16
Digital Input/
Output relay
Gr32
Gr32
Interface
ZONE 32
Gr32
Gr32
ZONE 64
EN
-EN
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smart manager

Table of Contents