Securing The Cables - Siemens SIMATIC HMI KP400 Comfort Operating Instructions Manual

Hmi devices comfort panels
Hide thumbs Also See for SIMATIC HMI KP400 Comfort:
Table of Contents

Advertisement

Function test
Perform a function test following commissioning. The HMI device is fully functional when one
of the following states is indicated:
● The "Transfer" dialog is displayed.
● The Start Center is displayed.
● A project is started.
Switching off the HMI device
Terminate the project on the HMI device before switching it off.
You have the following options for switching off the HMI device:
● Switch off the power supply.
● Unplug the power supply connector from the HMI device.
See also
Configuring transfer (Page 96)
3.3.10

Securing the cables

After the power-on test, use cable ties to secure the connected cables to the marked fixing
elements for strain relief.
The figure below shows the fastening components with the TP1500 Comfort V2 device as an
example.
Comfort Panels
Operating Instructions, 07/2017, A5E36770603-AB
Mounting and connecting the HMI device
3.3 Connecting the device
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents