HP XP7 User Manual page 58

Provisioning for mainf rame systems
Hide thumbs Also See for XP7:
Table of Contents

Advertisement

Procedure
1.
Open the Logical Devices window.
In Command View Advanced Edition:
a.
On the Resources tab, click Storage Systems, and then expand All Storage Systems.
b.
Expand the target storage system, right-click Volumes, and then select System GUI.
In Remote Web Console:
a.
Click Storage Systems, and then expand the Storage Systems tree.
b.
Click Logical Devices.
2.
In the Logical Devices window, select the LDEV ID of the LDEV that has the MP blade you want
to change.
3.
Click More Actions, and then select Assign MP Blade.
4.
In the Assign MP Blade window, specify the MP blade in MP Blade.
5.
Click Finish.
The Confirm window appears.
6.
In the Task Name text box, type a unique name for the task or accept the default.
You can enter up to 32 ASCII characters and symbols, with the exception of: \ / : , ; * ? "
< > |. The value "date-window name" is entered by default.
7.
Click Apply.
If the Go to tasks window for status check box is selected, the Tasks window appears.
58
Configuring custom-sized provisioning

Advertisement

Table of Contents
loading

Table of Contents