14.
Partially install the left ceiling panel on the room.
Place a piece of packing between the bottom of
ceiling and the top of the wall panel close to the peak.
This will allow the panels to have space between the
peaks. Connect the wire harnesses between the right
ceiling and left ceiling peaks. Once the wires are
connected insert them in the right ceiling hole and
lower the ceiling down on the walls.
Note: Ensure the ceiling panels are pushed to the peak
before installing screws.
15.
See predrilled holes in ceil. Secure the
ceiling to walls with screws.
710-0131
Rev. 02
Page 8 of 16
05/05/15