Cisco Asr-920-24Sz-Im, Asr-920-24Sz-M, Asr-920-24Tz-M Aggregation Services Router Hardware Installation - Cisco ASR-920-24SZ-IM Hardware Installation Manual

Aggregation services router
Hide thumbs Also See for ASR-920-24SZ-IM:
Table of Contents

Advertisement

Installing an AC power Supply
Step 2
Lift the power retainer and plug in the AC power supply.
Step 3
Push the retainer cord towards the power supply cord to lock it in place as shown in the figure below.
Figure 39: Locking the Power Retainer Cord
Step 4
Connect the other end of the power cord to an AC-input power source.
Step 5
Verify power supply operation by checking that the power supply LED is green.
Step 6
If the LEDs indicate a power problem, see LED Indicators section for troubleshooting information.
Step 7
If you are installing a redundant power supply, repeat these steps for the second power source.
If you are installing a redundant AC power supply, ensure that each power supply is connected to a separate
Note
power source in order to prevent power loss in the event of a power failure.

Cisco ASR-920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M Aggregation Services Router Hardware Installation

Guide
88
Installing the Router

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Asr-920-24tz-mAsr-920-24sz-m

Table of Contents