Scheduled Servicing
Checking Dispenser Operation
Checking the Sealing of the Solenoid
Compac Industries Ltd.
To check that the dispenser is operating correctly:
1.
Fill two gas bottles.
2.
Check that:
The bottles fill to the desired pressure.
The dispenser fills to the preset value.
The displays and gauges are working
De-gas the hose by opening the 3 way
valve.
When the hose is empty check that the flow
has stopped. If the flow does not stop, the
seals in the final stage solenoid will need to
be replaced. (see page 48)
Page 42
Servicing
www.compacngv.com
Need help?
Do you have a question about the CNG and is the answer not in the manual?
Questions and answers