Commissioning The Device; Preparations; Checking Delivery - Siemens SIMATIC ITP1000 Operating Instructions Manual

Industrial tablet pc
Hide thumbs Also See for SIMATIC ITP1000:
Table of Contents

Advertisement

Commissioning the device

3.1

Preparations

3.1.1

Checking delivery

Unpacking the device
Note the following points when unpacking the device:
● Keep the original packaging of the device in case you have to transport the device again.
● Keep the enclosed documentation in a safe place. It is required for initial commissioning
and is part of the device.
● Check the delivery unit for any signs of visible transport damage.
● Check the delivery and your specially ordered accessories against the packaging list to
ensure nothing is missing.
● If you determine any transport damage or defects when unpacking the device, notify your
local sales outlet.
SIMATIC ITP1000
Operating Instructions, 05/2017, A5E37340160-AB
3
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents