Figure 43. Replacing the battery
3. Insert the new battery:
Figure 44. Installing the battery
4. Reinstall the appliance cover and connect the cables.
5. Switch on the appliance.
6. Start the Configuration/Setup Utility program and set configuration parameters.
64
™
IBM TotalStorage
Network Attached Storage 200 Installation Guide
a. Tilt the battery so that you can insert it into the socket, under the battery
clip.
b. As you slide it under the battery clip, press the battery down into the socket.
Note: Wait approximately 20 seconds after you plug the power cord of your
appliance into an electrical outlet for the Power Control button to become
active.
v Set the system date and time.
v Set the power-on password.
v Reconfigure your appliance.