Metering Conventions - GE M60 UR Series Instruction Manual

Motor protection system
Table of Contents

Advertisement

6.3 METERING
6.3METERING
a) UR CONVENTION FOR MEASURING POWER AND ENERGY
The following figure illustrates the conventions established for use in UR-series relays.
Generator
G
M
Inductive
Generator
G
6
Inductive
M
G
Generator
G
Generator
Figure 6–1: FLOW DIRECTION OF SIGNED VALUES FOR WATTS AND VARS
6-14
Voltage
WATTS = Positive
VARS = Positive
PF = Lag
Current
UR RELAY
LOAD
Resistive
Voltage
WATTS = Positive
VARS = Negative
PF = Lead
Current
UR RELAY
LOAD
Resistive
Resistive
LOAD
Voltage
WATTS = Negative
VARS = Negative
PF = Lag
Current
UR RELAY
Resistive
LOAD
Voltage
WATTS = Negative
VARS = Positive
PF = Lead
Current
UR RELAY
827239AC.CDR
M60 Motor Protection System
PER IEEE CONVENTIONS
PARAMETERS AS SEEN
BY THE UR RELAY
VCG
IC
VAG
IB
IA
VBG
-
1
VCG
IA
IC
VAG
IB
VBG
-
2
VCG
IB
IA
VAG
IC
VBG
-
3
VCG
IB
VAG
IC
IA
VBG
-
4
6 ACTUAL VALUES

6.3.1 METERING CONVENTIONS

+Q
PF = Lead
PF = Lag
IA
-P
+P
PF = Lag
PF = Lead
-Q
S=VI
+Q
PF = Lead
PF = Lag
-P
+P
IA
PF = Lag
PF = Lead
-Q
S=VI
+Q
PF = Lead
PF = Lag
-P
+P
IA
PF = Lag
PF = Lead
-Q
S=VI
+Q
PF = Lead
PF = Lag
IA
-P
+P
PF = Lag
PF = Lead
-Q
S=VI
GE Multilin

Advertisement

Table of Contents
loading

Table of Contents